© 2024 Ideastream Public Media

1375 Euclid Avenue, Cleveland, Ohio 44115
(216) 916-6100 | (877) 399-3307

WKSU is a public media service licensed to Kent State University and operated by Ideastream Public Media.
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

E24 | First Period Gambrel | New Life

Season 44 Episode 24 | 23m 42s

The hard work continues to ensure all features are properly woven into the original house, like the new granite veneer water table. The original roof boards are installed on the ceiling in the new ell. A new fieldstone wall creates a defined front entrance. The new plumbing manifold is explained. A young carpenter talks about his return to the trades. A window sash is installed in a door.

Aired: 05/24/23 | Expires: 06/08/23
Funding for THIS OLD HOUSE is provided by The Home Depot.
Extras
The dilapidated 1890s Victorian house has been restored and the crew is back for a tour.
The HVAC system is connected and tested. The custom wallpaper is hung in the dining room.
This Old House turns their tired, 19th century 2.5 bedroom house, into a 3 generation gem
Take a sneak peek at TOH Detroit in our Web series finale. TOH episodes return March 30.
Go behind the scenes in Detroit to learn more about the unique renovation process
Though there are plenty of houses in Detroit, the Polks knew at once this was their home.
Go behind the scenes of This Old House Season 37 in Detroit
Meet the amazing city that’s revitalizing its distinctive architectural style
The 36th Season of This Old House renovates a Victorian Shingle-Style home in Belmont, MA
Homes for Our Troops is making Matt DeWitt's home accessible for him and his family.
All
  • All
  • Lexington / Glen Ridge
  • Atlanta / Newburyport / Ipswich
  • Concord Country Cape
  • Seaside Victorian Cottage
  • This Old House
  • Jamestown Net-Zero House
  • This Old House
  • This Old House Season 36
  • This Old House Season 35
A new project begins - an 1887 Victorian being renovated for multigenerational living.
The accessible renovation of the mid-century modern home in Lexington, MA is complete.
A final review of the geothermal system is done, and a blower door test is performed.
The homeowners sit down for an interview about their son and Duchenne muscular dystrophy.
The new mechanical room is revealed. In-wall lights are installed at the front ramp.
The elevator cab is built, and audio-visual technologies are explored for accessibility.
Electrical work for the elevator begins and the therapy pool is installed.
Insulation and tile prep is in progress. A motorized multi-slide door is installed.
A lesson on stucco is given, the siding is installed, and patio drainage is addressed.
A custom gutter is built. The neighbor's house, designed by the same architect, is toured.