© 2024 Ideastream Public Media

1375 Euclid Avenue, Cleveland, Ohio 44115
(216) 916-6100 | (877) 399-3307

WKSU is a public media service licensed to Kent State University and operated by Ideastream Public Media.
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations
Access to this video is benefit for member through

E6 | Lexington Modern | Reworked and Rewired

Season 45 Episode 6 | 23m 42s

The project house is progressing with an eye toward accessibility and the mid-century modern aesthetic. Geothermal pipes are run from the wells into the house. Wood blocking is installed for the future mounting of assistive devices. The new floor system allows for running new electrical wires without being visible. Old receptacle boxes in the original brick walls are replaced without damage.

Aired: 11/01/23 | Expires: 07/25/24
Funding for THIS OLD HOUSE is provided by The Home Depot and Leesa.
Extras
The dilapidated 1890s Victorian house has been restored and the crew is back for a tour.
The HVAC system is connected and tested. The custom wallpaper is hung in the dining room.
This Old House turns their tired, 19th century 2.5 bedroom house, into a 3 generation gem
Take a sneak peek at TOH Detroit in our Web series finale. TOH episodes return March 30.
Go behind the scenes in Detroit to learn more about the unique renovation process
Though there are plenty of houses in Detroit, the Polks knew at once this was their home.
Go behind the scenes of This Old House Season 37 in Detroit
Meet the amazing city that’s revitalizing its distinctive architectural style
The 36th Season of This Old House renovates a Victorian Shingle-Style home in Belmont, MA
Homes for Our Troops is making Matt DeWitt's home accessible for him and his family.
All
  • All
  • Lexington / Glen Ridge
  • Atlanta / Newburyport / Ipswich
  • Concord Country Cape
  • Seaside Victorian Cottage
  • This Old House
  • Jamestown Net-Zero House
  • This Old House
  • This Old House Season 36
  • This Old House Season 35
Restoration of the 1887 Victorian in Glen Ridge, NJ is complete. The crew gets a tour.
A built-in bench is constructed. The primary bathroom vanity gets a new durable finish.
A baseboard detail becomes a focal point, and a prefabricated shower niche is installed.
A new brick walkway and wood fiber insulation are installed. ERVs and HRVs are discussed.
A custom jamb and threshold are built. Various water-resistive barriers are compared.
A trip is taken to the Empire State Building and the new plumbing system is discussed.
The new two-story addition is framed, and plumbing pipes are isolated from cold weather.
Termite damage is discovered. A high school student works as a framer on the project.
Work begins on the 1887 Victorian to make it suitable for multigenerational living.
A new project begins - an 1887 Victorian being renovated for multigenerational living.