© 2023 Ideastream Public Media

1375 Euclid Avenue, Cleveland, Ohio 44115
(216) 916-6100 | (877) 399-3307

WKSU is a public media service licensed to Kent State University and operated by Ideastream Public Media.
Play Live Radio
Next Up:
0:00
0:00
Available On Air Stations

E23 | First Period Gambrel | Factory Built

Season 44 Episode 23 | 23m 42s

The project is halfway through construction. A closet is built in the original gambrel bedroom, and a water harvesting system is installed in the yard. The homeowner tours a handmade lighting factory. A gas boiler is vented to mimic a plumbing vent stack pipe. The old barn is replaced with a new boathouse built in a factory and assembled onsite in a day. Shrubs are protected for future planting.

Aired: 05/17/23 | Expires: 06/01/23
Funding for THIS OLD HOUSE is provided by The Home Depot and GAF.
Extras
The dilapidated 1890s Victorian house has been restored and the crew is back for a tour.
The HVAC system is connected and tested. The custom wallpaper is hung in the dining room.
This Old House turns their tired, 19th century 2.5 bedroom house, into a 3 generation gem
Take a sneak peek at TOH Detroit in our Web series finale. TOH episodes return March 30.
Go behind the scenes in Detroit to learn more about the unique renovation process
Though there are plenty of houses in Detroit, the Polks knew at once this was their home.
Go behind the scenes of This Old House Season 37 in Detroit
Meet the amazing city that’s revitalizing its distinctive architectural style
The 36th Season of This Old House renovates a Victorian Shingle-Style home in Belmont, MA
Homes for Our Troops is making Matt DeWitt's home accessible for him and his family.
All
  • All
  • Atlanta / Newburyport / Ipswich
  • Concord Country Cape
  • Seaside Victorian Cottage
  • This Old House
  • Jamestown Net-Zero House
  • This Old House
  • This Old House Season 36
  • This Old House Season 35
Original roof boards are installed on the ell ceiling. A fieldstone wall is built.
The roof is insulated from the outside. A lighting solution for the new ell is devised.
HVAC ducts are creatively hidden. A cinderblock enclosure gets covered with stone.
The old ell has been reassembled. A steel beam carries the weight of the new roof.
A chimney is saved from demo. A sewer ejector is installed. Kevin goes clamming.
The timber frame structure is disassembled. The homeowner considers a new house color.
A plan is devised to raise the timber frame in the ell. A book from 1826 is found.
Exploratory demo is done, and a 1717 home on the oldest street in Ipswich is toured.
The crew takes on a first period home in Ipswich, MA. They get a tour from the homeowners.
Renovation on the 1902 house is complete. The crew participates in the town's bed race.