E17 | First Period Gambrel | Prep-Work

Season 44 Episode 17 | 23m 42s

Excavation has begun for the foundation for the two-story addition off the opposite side of the ell. A post and beam system supports the house so the existing foundation can be removed to open the old basement up to the new. A plan is devised to raise the timber frame in the ell. An old cistern uncovered under the ell is examined. Drainage issues are addressed. A book from 1826 found during demo.

Aired: 04/05/23 | Expires: 04/20/23
Funding for THIS OLD HOUSE is provided by The Home Depot.
Extras
The dilapidated 1890s Victorian house has been restored and the crew is back for a tour.
The HVAC system is connected and tested. The custom wallpaper is hung in the dining room.
This Old House turns their tired, 19th century 2.5 bedroom house, into a 3 generation gem
Take a sneak peek at TOH Detroit in our Web series finale. TOH episodes return March 30.
Go behind the scenes in Detroit to learn more about the unique renovation process
Though there are plenty of houses in Detroit, the Polks knew at once this was their home.
Go behind the scenes of This Old House Season 37 in Detroit
Meet the amazing city that’s revitalizing its distinctive architectural style
The 36th Season of This Old House renovates a Victorian Shingle-Style home in Belmont, MA
Homes for Our Troops is making Matt DeWitt's home accessible for him and his family.
All
  • All
  • Lexington / Glen Ridge
  • Atlanta / Newburyport / Ipswich
  • Concord Country Cape
  • Seaside Victorian Cottage
  • This Old House
  • Jamestown Net-Zero House
  • This Old House
  • This Old House Season 36
  • This Old House Season 35
The crew is renovating a home to be accessible for a young boy with muscular dystrophy.
Restoration is complete on the 1720 first period home in Ipswich, MA. The house is toured.
A sink is fabricated out of soapstone, and a backsplash is fabricated from an old board.
Original roof boards are installed on the ell ceiling. A fieldstone wall is built.
The old barn is replaced with a new boathouse built in a factory and assembled onsite.
The roof is insulated from the outside. A lighting solution for the new ell is devised.
HVAC ducts are creatively hidden. A cinderblock enclosure gets covered with stone.
The old ell has been reassembled. A steel beam carries the weight of the new roof.
A chimney is saved from demo. A sewer ejector is installed. Kevin goes clamming.
The timber frame structure is disassembled. The homeowner considers a new house color.